The existing bridge from 1965 no longer met the requirements with respect to stability and safety. To this end, the existing trough, consisting of steel girders and backfill concrete, was replaced by a wider trough with load-dissipating borders. The track geometry was also modified to achieve a better routing of the BLS route.