Project Description

Parallel to the reconstruction of Bellevueplatz, the tram stops at Bellevue were also altered to enable access by handicapped persons. This required substantial modifications to the track geometry. The bicycle paths were adapted and extended at the same time, together with the paving of Sechseläutenplatz. The tram tracks on Bellevueplatz and the Quay Bridge were replaced on behalf of the Zurich Public Transport Authority.

Water on the tracks and roads is now largely drained directly into the Limmat River via a clean water pipe. In this way, the drainage was adapted to applicable regulations.

The entire Quay Bridge was completely renovated.

In the process, the ceiling of a hollow block in the overbank section was also torn down and replaced with a reinforced concrete ceiling.

Special Features of the Project

Work was performed in two-shift operation. Despite the very high density of traffic and trams on the Quay Bridge and at Bellevueplatz, all tram traffic had to be temporarily shut down during certain phase of construction.

Walo Bertschinger AG


Giessenstrasse 5
Postfach, 8953 Dietikon 1


+41 44 745 23 11

March – December 2015

Tiefbauamt der Stadt Zürich
Werdmühleplatz 3
8001 Zürich

Locher Ingenieure AG
Pelikan-Platz 5
Postfach
8022 Zürich

11.75m CHF

Overview
Impressum schliessen
Responsibility

www.walo.ch is the official website of Walo Bertschinger AG.

 

Walo Bertschinger AG

Heimstrasse 1

8953 Dietikon

Tel. +41 44 444 31 11

walo@walo.ch

 

Concept / Design / Implementation

Die Gestalter AG, St.Gallen

Content
Webmail
Web portals
WALO IT-ServiceDesk

Tel: +41 (0)848 000 118

E-Mail: IT-ServiceDesk@walo.ch

Mo-Fr 06:30-12:00 / 13:00-17:30 Uhr

 

Download Quick Support

Download - WALO-Logos
Subsidiaries
Gerschwiler AG