Who we are
Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.
What we do
WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.
Projects
We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.
Products
Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.
Career
Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.
Locations
With our locations in three countries, we are successfully active for you worldwide.
Shop, experience, work...
... is the motto in the new Riedmatt shopping center in Rümlang (ZH).
As a center of attraction in the region, the commercial building received an expansion and revitalization and now appears much friendlier and more spacious, not least because of the light-colored HALTOPEX® flooring.
The versatile HALTOPEX® rubber granulate flooring was not only installed in individual stores, but also serves as a safe and easy-to-clean floor covering on the heavily used main walkways in the center of the mall. Wood and aluminum inlays in the flooring set visual accents, while darker HALTOPEX® lines provide a varied setting for the surfaces. The necessary stability of the sub-layers is ensured by DURATEX® screeds and hard concretes, while cement tiles and synthetic resin mortars from WALO were used as leveling layers.
Conventional paving in the area of the mall would have meant a major disruption to the general progress of the construction work, since the large area of 2,600 m2 not only represented the central thoroughfare for the entire construction, but a large part of the work of other companies also had to take place here. After consultation with the site management, WALO planned the paving concept in such a way that a full closure of this important area could be avoided and other trades were not hindered. By using an innovative paver, the paving time was also reduced by 30%.