Who we are
Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.
What we do
WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.
Projects
We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.
Products
Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.
Career
Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.
Locations
With our locations in three countries, we are successfully active for you worldwide.
The national road N02 was put into operation in the 1970s. After 40 years of operation, the existing national road section is in need of rehabilitation.
The bridge structure Aufgeständerte Schwarzwaldallee in the maintenance section Osttangente Basel was subjected to a comprehensive condition check. Based on this, measures were planned in accordance with the project objectives, which have now been implemented in a complete overhaul with structural reinforcement.
The following main works were carried out in this context:
Traffic management took a key position during the repair work, both on the national highway and on the city level. The traffic flow on the highway had to be permanently guaranteed during the day and the number of lanes could not be reduced. For this reason, the repair work on the freeway was carried out at night by means of lane removal and traffic detour. The work on the local road level was carried out during the day. In total, the rehabilitation measures on the freeway were implemented in four construction phases and on the local road level in three construction phases.
Walo Bertschinger AG
Giessenstrasse 5
8953 Dietikon 1
Road Construction & Civil Engineering
Concrete Rehabilitation and Hydrodynamics