Who we are
Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.
What we do
WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.
Projects
We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.
Products
Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.
Career
Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.
Locations
With our locations in three countries, we are successfully active for you worldwide.
In 2015, the Zurich Transport Authority (VBZ) planned to replace its tracks on the Quaibrücke bridge and to reconstruct the Bellevue stop. The Civil Engineering Office took this opportunity to repair the entire Quaibrücke bridge, the cavity on the Bellevue side and parts of the road surface on the Bürkliplatz side. By replacing the waterproofing and surfacing, the Quaibrücke should once again be optimally protected for the next 25 years.
With the reinforcement of the cavity slab on the Bellevue side, the standard-compliant load-bearing capacity is to be met again. The VBZ streetcar tracks are at the end of their useful life and had to be replaced. By moving the VBZ / EWZ candelabra to the edge of the bridge, more space was created for wider bike lanes.
As an additional order during execution, WALO also received the widening of the bridge, which was completed by the Sechseläuten 2016.
Walo Bertschinger AG
Giessenstrasse 5
8953 Dietikon 1
Concrete Rehabilitation and Hydrodynamics
Trackwork & Rail Engineering
Mastic Asphalt
We appreciate your interest in the WALO Group and will be happy to answer any questions you may have.
Headquarters
Giessenstrasse 5
Postfach, 8953 Dietikon 1