• Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
  • Who we are
  • What we do
  • Projects
  • Products
  • Career
  • Contact
Back

Who we are

Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.


Overview
Back

What we do

WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.


Overview
Back

Projects

We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.


Overview
Back

Products

Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.


Overview
Back

Career

Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.


Overview

La Muela Reservoir, Spain

WALO undertakes mastic renewal of Spain's largest pump storage scheme while avoiding contamination of the water. The challenge? Working above the water after partially emptying the reservoir.

Case Study Description

The Pump Storage Scheme at La Muela in Valencia is the biggest of its kind in Spain. The upper reservoir has a circumference of 4,800m and stores 23 million cubic meters of water, generating a similar amount of energy to that of a nuclear power plant. A major upgrade program was necessary, consisting of the construction of a new underground power house, tunnels and penstock. As a shutdown of the plant had to be scheduled to undertake the upgrade, WALO was commissioned to carry out a mastic renewal of the upper reservoir, which covers an area of 1,400,000 square meters. The particular challenge facing WALO was to undertake the work after only partly emptying the upper reservoir so the work had to be carried out above the water, avoiding any contamination of the water remaining in the reservoir.

This meant that the huge amount of sediment on the slopes, which was cleaned off by WALO had to be removed from the site by truck, without any of it being washed into the reservoir water below the work area. To add to the challenge, the only access to the site was via the crest road. This presented a huge logistical problem as that route could easily be blocked by just one vehicle so the movement of materials and work teams was very restricted and had to be carefully planned. After a scheduled shutdown of the Pump Storage Scheme, the upper reservoir was partly emptied so that only 25% of the water was left and a new mastic coating was installed by WALO. The works consisted of cleaning the existing bituminous face by hydro-jet washing and removing the sediment on the slopes, spraying a new bitumen emulsion and applying a new mastic sealing to the 43m long slopes which have an incline of 1:1.6.

walo-us-project-la-muela-upper-reservoir-1200x628px
Contact

Walo Bertschinger AG
Giessenstrasse 5
8953 Dietikon 1

Location
Spain
Service

Hydraulic Asphalt Engineering

Building time
2012