Who we are
Anchored in Switzerland and internationally active, WALO is managed as a family business in the 4th and 5th generation. For over 100 years, WALO has focused on the combination of consistency and innovation.
What we do
WALO is active as an innovative total solutions company in all markets of the construction industry. The family-owned company has established itself as a reliable partner in the construction industry and infrastructure projects in Switzerland and worldwide with its decades of experience and the permanent development of sustainable as well as economical solutions.
Projects
We have successfully implemented many challenging projects. Therefore, we proudly let our references speak for our work.
Products
Whether residential, industrial, healthcare, outdoor or for sports and leisure facilities - seamless floor coverings have to meet a wide variety of requirements on a permanent basis.
Career
Good buildings and thus satisfied customers require precise construction work. All our employees, from unskilled workers to engineers, play a key role in ensuring that we achieve this goal time and time again.
Locations
With our locations in three countries, we are successfully active for you worldwide.
Goldisthal pump storage scheme is situated 50 km south of Erfurt in the Thuringian mountains, Germany. The power station, operated by Vattenfall Hydropower Generation, has a power output of 1,060 MW and is the largest pump storage plant in Europe. The upper reservoir, which has a capacity of 12,000,000 m3 water, is lined with Dense Asphaltic Concrete (DAC) and it required a new mastic coating, covering a surface area of 330,000 m2. Mastic consists of bitumen, filler and sometimes sand and is spread onto the dense layer in a liquid form. It protects the DAC against UV radiation and creates an elastic film at the surface.
The accumulation of sediments in a reservoir, when at a certain thickness and composition, can result in enormous shrinking forces while drying. A mastic coating can help to reduce sedimentation and so reduce these shrinking forces. The mastic seals the pores of the lining,which reduces vulnerability to attack by mechanical forces.
To complete the required works, WALO needed to clean the sediments from the lower part of the slope and a third of the base and then apply the new mastic coating. By having the lower part of the slope and the upper parts of the base sealed, Vattenfall can significantly increase the amount of usable water for power production.
The variable weather conditions in the Thuringian mountains and the need to keep the reservoir operational for as long as possible meant that there was considerable time pressure to complete the works in a limited time. WALO had four to five teams working alongside each other seven days a week to compensate for delays caused by bad weather. The reservoir was only empty for four weeks and all the works were completed in just six weeks.